Skip to main navigation.

Billing Cycles

This spring, we made two changes

to Cotton Electric billing cycles:

1. The four-cycle billing system was streamlined to a two-cycle system.
    Cycle 2 was absorbed into Cycle 1 and Cycle 4 was absorbed into Cycle 3.
2. Billing dates and penalty dates are now tied to fixed dates within each month.
    Cycle 1 will be billed on the 5th of each month. Penalty date will be the 20th of each month.
    Cycle 3 will be billed on the 15th of each month. Penalty date will be the 1st of each month.
The changes became effective April 2016.

When is my bill due?

Here’s a little budget- planning help for Cotton Electric members. This downloadable, printable PDF lists the bill dates and past due dates.

Powered by Touchstone Energy Cooperatives Logo
Information about Co-op Connections Card Learn, play and save at Kids Energy Zone