2019 Pole Replacement

2019 Pole Replacement Bid Results

Lump sum bid results are as follows:

Utility Plus Inc.  *$150,775.28
Win Sons Poleline Const. Inc.$185,516.00
R&R Powerline Const. Inc.$199,298.50
Brexan Line Service$194,458.16
Canyon Power Solutions$269,865.00

* awarded bid